Step 3: Tighten the piping flange bolts to the locking nuts / washers on the opposite flange. Each should be
tightened by cross-bolting with the proper torque based as described in ASME PCC-1 on NPS, ANSI/ASME
Class rating, and gasketing used.
ASSEMBLY REMOVAL
IMPORTANT: In the event the assembly needs to be removed from process, follow the manufacturer’s rec-
ommended procedure to prevent possible injury and/or damage.
A. Confirm process has been shut down with process pressure relieved and piping drained, cleaned and
dried before installation and/or removal of product assembly.
B. Ensure the assembly is supported prior to removal of bolts/flanges.
P
IPE FLANGE
(NPS 4", CLASS 300 SHOWN)
C
ENTERING GAGE
ISOLATION RING
(
NPS 4", TYPE 80 SHOWN)
FLANGE BOLT
INSTRUMENT REMOVAL DEVICE
(NEEDLE VALVE SHOWN)
ASSEMBLY FLANGE
ASSEMBLY SCREW
FLEXIBLE LINER
SENSING FLUID
FILL PORT
CENTER BODY
FLANGE GASKET
FLANGE BOLT
6- ASSEMBLY REMOVAL